How To Fix R11232 - Old or new planning date invalid


R11232 - Overview

  • Message type: E = Error

  • Message class: R11 - Business Partner and BDT

  • Message number: 232

  • Message text: Old or new planning date invalid

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message R11232 - Old or new planning date invalid ?
    The SAP error message R11232, which states "Old or new planning date invalid," typically occurs in the context of planning and scheduling within SAP systems, particularly in modules like SAP PP (Production Planning) or SAP APO (Advanced Planning and Optimization). This error indicates that the planning dates being used in a transaction or process are not valid according to the system's configuration or the data being processed.
    Causes:
    
    Invalid Date Range: The old or new planning date may fall outside the permissible range defined in the system settings.
    Date Format Issues: The date format may not be recognized by the system, leading to validation errors.
    Planning Horizon: The planning horizon may not be set correctly, causing the dates to be considered invalid.
    Master Data Issues: There may be issues with the master data (e.g., material master, production version) that affect the validity of the planning dates.
    Configuration Settings: Incorrect configuration in the planning parameters or settings

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author