Message type: E = Error
Message class: QT - QM: Inspection during production (with inspection points)
Message number: 228
Message text: Operation &1 of sequence &2 cannot be confirmed
On the following screen, you can confirm inspection point data as well
as carry out an order confirmation. However, an order confirmation is
not permitted for the current operation.
The partial and/or final confirmation indicator is not ready for input
and so, a confirmation cannot be made to production planning.
However, QM relevant inspection point data can be recorded.
Error message extract from SAP system. Copyright SAP SE.
QT228
- Operation &1 of sequence &2 cannot be confirmed ?The SAP error message QT228, which states "Operation &1 of sequence &2 cannot be confirmed," typically occurs in the context of production planning and control, particularly when dealing with production orders and routing sequences. This error indicates that there is an issue with confirming a specific operation in a routing sequence for a production order.
Causes:
- Operation Not Started: The operation you are trying to confirm may not have been started yet. Confirmations can only be made for operations that have been started.
- Incorrect Sequence: The operation may not be the next one in the sequence. You must confirm operations in the order they are defined in the routing.
- Status Issues: The production order or operation may be in a status that does not allow confirmation (e.g., if the order is closed or technically completed).
- Missing Data: Required data for the confirmation (like actual work time, quantities, etc.) may be missing or incorrectly entered.
- Resource Availability: The resources (machines, tools, etc.) required for the operation may not be available or may not have been set up correctly.
Solutions:
- Check Operation Status: Ensure that the operation you are trying to confirm has been started. If it hasn't, you need to start it first.
- Confirm in Sequence: Make sure you are confirming operations in the correct order as defined in the routing. If you skipped an operation, you need to confirm that one first.
- Review Production Order Status: Check the status of the production order. If it is not in a state that allows confirmation, you may need to change its status or consult with your production planning team.
- Enter Required Data: Ensure that all necessary data for the confirmation is entered correctly. This includes quantities produced, time taken, and any other relevant information.
- Check Resource Setup: Verify that all resources required for the operation are available and properly set up in the system.
Related Information:
If the issue persists after checking these aspects, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and control.
Get instant SAP help. Start your 7-day free trial now.
QT227
The unit of measurement is not defined for this material
What causes this issue? If you enter a material that differs from that of the inspection lot, the unit of measure must be defined for this new materi...
QT226
Confirmation not allowed or not activated
What causes this issue? You want to branch to the details screen for PP confirmation data. This is not possible, however, since the indicator for &qu...
QT229
This function is not supported for this order type
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
QT230
&1 &2 do not exist in the object list for order &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.