Do you have any question about this error?
Message type: E = Error
Message class: QST - Stability Study
Message number: 078
Message text: The inspection plan entered is not compatible with the strategy :&
You are trying to assign an inspection plan to a testing schedule item
(storage condition) that is not compatible with the strategy of the
testing schedule. Either the selected inspection plan does not use any
strategy, or the strategy it uses is not identical to the one that was
created for the testing schedule.
You can only assign an inspection plan to a testing schedule item for a
stability study if the inspection plan uses the same strategy as the
testing schedule.
Select an inspection plan that uses the same strategy as the testing
schedule. You can use the function "Select Inspection Plan" to do this.
When you use this function, you can also see the packages assigned to
the inspection operations in the inspection plans.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
QST078
- The inspection plan entered is not compatible with the strategy :& ?The SAP error message QST078 indicates that there is a compatibility issue between the inspection plan you are trying to use and the quality inspection strategy defined in the system. This error typically arises in the context of quality management (QM) processes, particularly when dealing with inspection plans and sampling procedures.
Cause:
- Mismatch in Inspection Plan and Strategy: The inspection plan you are trying to use may not be compatible with the quality inspection strategy defined for the material or process. This could be due to differences in characteristics, sampling procedures, or other parameters.
- Incorrect Configuration: The configuration settings for the inspection plan or the quality inspection strategy may not align. This could include settings related to the type of inspection, sampling methods, or other relevant parameters.
- Missing or Incorrect Data: There may be missing or incorrect data in the inspection plan or the material master that is causing the incompatibility.
Solution:
- Check Inspection Plan: Review the inspection plan you are trying to use. Ensure that it is correctly defined and that all necessary characteristics and sampling procedures are included.
- Verify Quality Inspection Strategy: Check the quality inspection strategy assigned to the material or process. Ensure that it is compatible with the inspection plan. You may need to adjust the strategy or create a new one that aligns with the inspection plan.
- Configuration Review: Review the configuration settings in the Quality Management module. Ensure that the settings for inspection plans and strategies are correctly defined and aligned.
- Data Consistency: Ensure that all relevant data in the material master, inspection plan, and quality inspection strategy is consistent and correctly maintained.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on the compatibility requirements between inspection plans and quality inspection strategies.
Related Information:
QP01
(Create Inspection Plan), QP02
(Change Inspection Plan), and QP03
(Display Inspection Plan) to manage inspection plans.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in Quality Management for further assistance.
Get instant SAP help. Start your 7-day free trial now.
QST077
An inspection of material samples is not planned in this inspection plan
What causes this issue? There is no inspection point that allows for the inspection of samples assigned to the selected inspection plan.System Respon...
QST076
The inspection plan is not available without restrictions
What causes this issue? The inspection plan that you have selected has a status that does not allow unrestricted use of the plan.System Response The...
QST079
The testing schedule & is not part of a stability study
What causes this issue? You want to maintain the reference object <LS>sample</> of a testing schedule item. The system determined that th...
QST080
The sample &1 is not part of stability study &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.