How To Fix QPVP038 - Enter the control key for oper. &1. Char. in line &2 not created.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: QPVP - Messages for QM developements

  • Message number: 038

  • Message text: Enter the control key for oper. &1. Char. in line &2 not created.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message QPVP038 - Enter the control key for oper. &1. Char. in line &2 not created. ?

    The SAP error message QPVP038 indicates that there is an issue with the control key for an operation in a production order or a similar process. Specifically, it suggests that the control key for the operation specified in the message has not been created or is missing.

    Cause:

    1. Missing Control Key: The control key for the operation is not defined in the system. This could happen if the operation was created without a control key or if the control key is not assigned to the operation.
    2. Incorrect Configuration: The control key may not be properly configured in the system, or it may not be valid for the operation type you are trying to use.
    3. Data Entry Error: There may have been a mistake during data entry, leading to the omission of the control key.

    Solution:

    1. Check Control Key Assignment:

      • Go to the transaction code CA02 (Change Routing) or CA03 (Display Routing) to check the routing for the operation in question.
      • Ensure that a valid control key is assigned to the operation.
    2. Define Control Key:

      • If the control key is missing, you can define it in the configuration settings. Use transaction code OPKP to access the control key configuration.
      • Make sure that the control key is appropriate for the operation type and that it meets the requirements for the production process.
    3. Review Operation Details:

      • Check the details of the operation in the production order or routing to ensure that all necessary fields, including the control key, are filled out correctly.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for specific details on the control key and its implications for the operations you are working with.
    5. Contact SAP Support:

      • If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting SAP Notes for any known issues related to this error message.

    Related Information:

    • Control Key: The control key in SAP is used to define how an operation is processed in production. It determines various aspects such as whether the operation is relevant for costing, whether it can be confirmed, and how it interacts with other operations.
    • Routing: In SAP, routing defines the sequence of operations required to produce a product. Each operation in the routing can have specific parameters, including the control key.
    • Production Order: A production order is a document that authorizes the production of a specific quantity of a material. It contains all the necessary information for production, including the routing and operations.

    By following these steps, you should be able to identify and resolve the issue related to the QPVP038 error message in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker