How To Fix QA195 - A routing was already assigned via the order


SAP Error Message - Details

  • Message type: E = Error

  • Message class: QA - QM : Inspection lots

  • Message number: 195

  • Message text: A routing was already assigned via the order

  • Show details Hide details
  • What causes this issue?

    You want to use the inspection lot to carry out an inspection during
    production with a routing. However, a routing has already been assigned
    to the inspection lot by the production order.

    System Response

    The system prevents you from manually assigning a routing.

    How to fix this error?

    Select a different function.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message QA195 - A routing was already assigned via the order ?

    The SAP error message QA195, which states "A routing was already assigned via the order," typically occurs in the context of quality management and production planning. This error indicates that a routing (a sequence of operations or steps required to produce a product) has already been assigned to a production order, and the system is preventing any further assignments to avoid conflicts or inconsistencies.

    Cause:

    1. Existing Assignment: The routing has already been assigned to the production order, and the system does not allow reassigning or modifying it without proper procedures.
    2. Order Status: The production order may be in a status that does not allow changes to the routing (e.g., released or in process).
    3. Configuration Settings: The system settings or configuration may restrict changes to routings once they are assigned to an order.

    Solution:

    1. Check Existing Routing: Review the production order to confirm the routing that is currently assigned. You can do this by navigating to the production order details in SAP.
    2. Modify the Order: If you need to change the routing, you may need to:
      • Set the order to a status that allows changes (e.g., "Created" or "Partially Confirmed").
      • Remove the existing routing if applicable, and then assign the new routing.
    3. Use Alternative Methods: If the routing needs to be changed frequently, consider using alternative methods such as creating a new production order with the desired routing.
    4. Consult Documentation: Review SAP documentation or consult with your SAP support team for specific procedures related to your organization's configuration and policies regarding routing assignments.

    Related Information:

    • Transaction Codes: You may use transaction codes like CO02 (Change Production Order) or CO03 (Display Production Order) to view and modify production orders.
    • Quality Management: Ensure that the quality management settings are correctly configured to allow for the necessary changes in routings.
    • User Authorizations: Check if you have the necessary authorizations to make changes to production orders and routings.
    • SAP Notes: Look for any relevant SAP Notes that may address this specific error or provide additional guidance.

    If the issue persists after following these steps, it may be beneficial to reach out to your SAP support team for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker