Do you have any question about this error?
Message type: E = Error
Message class: PX - HR-PA: Error messages for XPRAs
Message number: 041
Message text: The time unit &1 is not assigned to a period parameter
No appropriate period parameter can be assigned to time unit &V1& in
client &V2&.
Period parameter "00" is assigned to entries with time unit &V1&.
In the "Period parameter" table, assign a period parameter to the time
unit and then replace "00" with this parameter.
Error message extract from SAP system. Copyright SAP SE.
PX041
- The time unit &1 is not assigned to a period parameter ?The SAP error message PX041, which states "The time unit &1 is not assigned to a period parameter," typically occurs in the context of time management or planning within SAP systems, particularly in modules like SAP Project System (PS) or SAP Controlling (CO). This error indicates that the specified time unit (e.g., days, weeks, months) is not correctly configured or linked to the relevant period parameter in the system.
Cause:
- Configuration Issue: The time unit you are trying to use has not been assigned to the relevant period parameter in the configuration settings.
- Missing Customization: The necessary customization for the time unit may not have been completed in the system.
- Incorrect Data Entry: The time unit may have been incorrectly entered in the transaction or report you are trying to execute.
Solution:
To resolve the PX041 error, you can follow these steps:
Check Configuration:
- Go to the configuration settings in SAP (transaction code SPRO).
- Navigate to the relevant area (e.g., Project System or Controlling).
- Look for the settings related to time units and period parameters.
- Ensure that the time unit in question is assigned to the appropriate period parameter.
Assign Time Unit:
- If the time unit is not assigned, you will need to create or modify the assignment.
- This may involve creating a new entry or modifying an existing one to include the time unit.
Review Master Data:
- Check the master data related to the project or cost center to ensure that the time unit is correctly defined and used.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on configuring time units and period parameters.
Testing:
- After making the necessary changes, test the transaction or report again to see if the error persists.
Seek Help:
- If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert who can provide further assistance.
Related Information:
By following these steps, you should be able to identify and resolve the cause of the PX041 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
PX040
The time unit &1 is assigned to several period parameters
What causes this issue? In the table used to assign <DS:DE.PERMO>period parameters</> to time units (T549R), time unit &V1& is as...
PX039
No entry in table &1 for &2 &3
What causes this issue? Incorrect entries have been found when converting tables T500C and T500W. These tables contain new entries from table T001. I...
PX042
Time unit &1 is invalid
What causes this issue? Only values allowed for the domain are permitted values for time units. The entry in the table is not valid for this domain. ...
PX043
Table T510F unconverted in client &1, since there are entries in T510W
What causes this issue? Entries already exist in table T510W. Table T510W has already been converted and modified.System Response The conversion has...
Click on this link to search all SAP messages.