Message type: E = Error
Message class: PV - Training and Event Management
Message number: 890
Message text: Copied duration does not match calculated duration
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PV890
- Copied duration does not match calculated duration ?The SAP error message PV890, which states "Copied duration does not match calculated duration," typically occurs in the context of project management or resource planning within SAP. This error indicates a discrepancy between the duration of a task or activity that has been copied and the duration that SAP has calculated based on the defined parameters (such as start and end dates, work hours, etc.).
Causes:
- Manual Entry Errors: The duration may have been manually entered incorrectly when copying from another task or project.
- Changes in Dates: If the start or end dates of the task have been modified after the duration was copied, it can lead to a mismatch.
- Resource Availability: If the resources assigned to the task have different availability or working hours, the calculated duration may differ from the copied duration.
- Project Settings: The project settings or parameters may have been altered, affecting how durations are calculated.
- Dependencies: If there are dependencies or constraints that affect the scheduling of the task, this can also lead to discrepancies.
Solutions:
- Verify Duration: Check the copied duration against the calculated duration. Ensure that the values match and make adjustments as necessary.
- Review Dates: Confirm that the start and end dates of the task are correct and consistent with the intended duration.
- Check Resource Allocation: Ensure that the resources assigned to the task are available and that their working hours align with the project’s scheduling.
- Adjust Project Parameters: Review the project settings to ensure that they are configured correctly for the tasks being managed.
- Recalculate: If necessary, recalculate the duration based on the current project settings and resource availability.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling this error in your version of SAP.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
PV889
Room reservation is not in planned status
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PV888
Room & is already in use during the required time
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PV891
Participant &1 &2 is not active during a certain period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...