Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix PV727 - Planning from & to & has been completed.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PV - Training and Event Management

  • Message number: 727

  • Message text: Planning from & to & has been completed.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PV727 - Planning from & to & has been completed. ?

    The SAP error message PV727, which states "Planning from & to & has been completed," typically indicates that a planning run has already been executed for the specified time period, and therefore, no further planning can be performed for that range until the existing planning is either reset or adjusted.

    Cause:

    1. Planning Already Executed: The primary cause of this error is that the planning process for the specified period has already been completed. This means that the system has already processed the data for that time frame, and any new planning attempts for the same period are blocked to prevent data inconsistencies.
    2. Incorrect Time Frame: The user may be trying to execute a planning run for a time frame that overlaps with an already completed planning run.
    3. Configuration Issues: There may be configuration settings in the planning module that restrict further planning actions for completed periods.

    Solution:

    1. Check Planning Status: Verify the status of the planning run for the specified period. You can do this by checking the planning logs or reports to see if the planning has indeed been completed.
    2. Adjust Time Frame: If you need to perform planning for a different period, adjust the "from" and "to" dates in your planning request to a range that has not been completed.
    3. Reset Planning: If you need to redo the planning for the same period, you may need to reset or delete the existing planning data. This can typically be done through specific transaction codes or functions in SAP, depending on your module (e.g., using transaction code C223 for resetting planning in SAP APO).
    4. Consult Documentation: Refer to the SAP documentation or help files related to your specific planning module (e.g., SAP APO, SAP S/4HANA) for detailed instructions on how to handle completed planning runs.
    5. Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert who can provide guidance based on your specific system configuration and requirements.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes that may help in managing planning runs, such as C223 (for resetting planning) or CPI1 (for planning results).
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Roles and Permissions: Ensure that you have the necessary permissions to perform planning actions in the system, as restrictions may also lead to errors.
    • System Configuration: Review the configuration settings in your planning module to ensure they align with your business processes and requirements.

    By following these steps, you should be able to address the PV727 error and continue with your planning activities in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker