Do you have any question about this error?
Message type: E = Error
Message class: PV - Training and Event Management
Message number: 414
Message text: No lock period selected
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PV414
- No lock period selected ?The SAP error message PV414: No lock period selected typically occurs in the context of the SAP system when dealing with planning or locking periods in various modules, such as SAP Controlling (CO) or SAP Project System (PS). This error indicates that the system is unable to find a valid lock period for the operation you are trying to perform.
Cause:
- No Lock Period Defined: The most common cause is that there is no lock period defined for the planning or controlling area you are working with.
- Incorrect Configuration: The configuration settings for the planning area or controlling area may not be set up correctly.
- Period Status: The period you are trying to access may not be open for posting or planning, leading to the system not being able to lock it.
- User Authorizations: The user may not have the necessary authorizations to access or modify the lock periods.
Solution:
Define Lock Period:
- Go to the relevant configuration settings in SAP (e.g., SPRO) and ensure that a lock period is defined for the planning area or controlling area you are working with.
- Navigate to the appropriate configuration path, such as:
- Controlling > Cost Center Accounting > Planning > Define Lock Periods.
- Ensure that the lock periods are correctly set up and that the current period is included.
Check Period Status:
- Verify that the period you are trying to access is open for posting or planning. You can check this in the period control settings.
- If the period is closed, you may need to open it or select a different period.
User Authorizations:
- Ensure that the user has the necessary authorizations to access the planning or controlling area. Check the user roles and authorizations in the user management settings.
Consult Documentation:
- If the issue persists, consult the SAP documentation or help resources for more specific guidance related to your version of SAP and the module you are working with.
Related Information:
KP06
(Cost Center Planning) or CJ20N
(Project Planning) depending on the context of the error.By following these steps, you should be able to identify and resolve the cause of the PV414 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
PV413
Error when deleting lock relationship
What causes this issue? Error deleting lock relationship. The system issues an error message and will not allow you to continue with this transaction...
PV412
Resource & unlocked from & to &
What causes this issue? The resource is unlocked in the period specified. The system issues an error message and will not allow you to continue with ...
PV415
Resource has been unlocked
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PV416
There are reservations in the lock period
What causes this issue? The resource is already reserved in the lock period you have specified.How to fix this error? If you decide to lock anyway, ...
Click on this link to search all SAP messages.