Do you have any question about this error?
Message type: E = Error
Message class: PV - Training and Event Management
Message number: 209
Message text: Select a resource type
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PV209
- Select a resource type ?The SAP error message PV209 "Select a resource type" typically occurs in the context of project management or resource planning within SAP, particularly when working with project systems (PS) or production planning (PP). This error indicates that the system requires the user to specify a resource type before proceeding with a particular action, such as creating or modifying a project or resource assignment.
Cause:
- Missing Resource Type: The user has not selected a resource type in the relevant field, which is mandatory for the operation being performed.
- Configuration Issues: There may be issues with the configuration of resource types in the system, leading to the inability to select a valid resource type.
- User Input Error: The user may have overlooked the selection of a resource type due to interface design or oversight.
Solution:
- Select a Resource Type: Ensure that you select a valid resource type from the dropdown or selection list provided in the interface. This is usually done in the resource assignment or project planning screen.
- Check Configuration: If the resource type is not available for selection, check the configuration settings in the SAP system. This may involve:
- Verifying that the resource types are correctly defined in the system.
- Ensuring that the necessary authorizations are in place for the user to access and select resource types.
- Consult Documentation: Refer to SAP documentation or help resources for guidance on the specific transaction or module you are working with, as there may be additional steps or requirements.
- Contact Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert to investigate further.
Related Information:
By following these steps, you should be able to resolve the PV209 error and continue with your work in SAP.
Get instant SAP help. Start your 7-day free trial now.
PV208
Business event has reserved no resources
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PV207
Error when delimiting convention
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PV210
Error when determining business event schedule
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PV211
Select only & resources
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.