How To Fix PSSC_TOOLS_UI048 - Begin Date &1 is greater than end date &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PSSC_TOOLS_UI - Messages for UI functions

  • Message number: 048

  • Message text: Begin Date &1 is greater than end date &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PSSC_TOOLS_UI048 - Begin Date &1 is greater than end date &2 ?

    The SAP error message PSSC_TOOLS_UI048 indicates that there is a problem with the date range specified in a transaction or process. Specifically, the error states that the "Begin Date" is greater than the "End Date," which is logically incorrect.

    Cause:

    This error typically occurs in scenarios where a date range is required, such as in planning, scheduling, or reporting functions. The system checks the validity of the date range, and if the start date (Begin Date) is later than the end date (End Date), it triggers this error message.

    Solution:

    To resolve this error, you should:

    1. Check the Dates: Review the dates you have entered in the relevant fields. Ensure that the Begin Date is earlier than or equal to the End Date.

    2. Correct the Input: If you find that the Begin Date is indeed greater than the End Date, correct the input by either:

      • Changing the Begin Date to an earlier date.
      • Changing the End Date to a later date.
    3. Validation: After making the changes, validate the input again to ensure that the error does not reoccur.

    4. Re-run the Process: Once the dates are corrected, re-run the transaction or process that triggered the error.

    Related Information:

    • Date Formats: Ensure that the dates are entered in the correct format as expected by the SAP system (e.g., DD/MM/YYYY or MM/DD/YYYY depending on your system settings).
    • User Permissions: If you are unable to change the dates, check if you have the necessary permissions to modify the entries.
    • Documentation: Refer to the SAP documentation or help files related to the specific transaction or module you are working with for additional context on date handling.
    • Support: If the issue persists after correcting the dates, consider reaching out to your SAP support team or consulting the SAP community for further assistance.

    By following these steps, you should be able to resolve the error and proceed with your work in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker