Do you have any question about this error?
Message type: E = Error
Message class: PSSC_NET - Net Calculation
Message number: 199
Message text: Error occurred in BAdI PSSCB_NET_EXT; method &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PSSC_NET199
- Error occurred in BAdI PSSCB_NET_EXT; method &1 ?The SAP error message PSSC_NET199, which indicates that an error occurred in the Business Add-In (BAdI) PSSCB_NET_EXT, typically arises during the execution of a process that involves the BAdI implementation. This error can occur in various scenarios, such as during the processing of network activities in project systems or when dealing with network-related data.
Cause:
The error can be caused by several factors, including:
Implementation Issues: The BAdI implementation may contain errors or may not be properly coded. This could include issues such as syntax errors, logic errors, or unhandled exceptions in the method being called.
Data Issues: The data being processed may not meet the expected criteria, leading to failures in the BAdI implementation. This could include missing or incorrect data in the relevant fields.
Configuration Issues: There may be configuration settings in the project system or network that are not set up correctly, leading to the BAdI not functioning as intended.
Authorization Issues: The user executing the process may not have the necessary authorizations to perform the actions defined in the BAdI.
Solution:
To resolve the PSSC_NET199 error, you can take the following steps:
Check BAdI Implementation:
- Review the implementation of the BAdI PSSCB_NET_EXT. Ensure that the method being called is correctly implemented and does not contain any errors.
- Use transaction SE19 to check the BAdI implementation and debug the code if necessary.
Analyze the Data:
- Check the data being processed when the error occurs. Ensure that all required fields are populated and that the data is valid.
- Use transaction SE11 to analyze the relevant database tables and ensure that the data integrity is maintained.
Review Configuration:
- Verify the configuration settings related to the project system and network. Ensure that all necessary settings are correctly configured.
- Check transaction OPUK for network configuration settings.
Check Authorizations:
- Ensure that the user executing the process has the necessary authorizations to access and execute the BAdI.
- Use transaction SU53 to analyze any authorization issues that may arise.
Debugging:
- If the issue persists, consider debugging the process to identify the exact point of failure. You can set breakpoints in the BAdI implementation to trace the execution flow.
Consult SAP Notes:
- Check the SAP Support Portal for any relevant SAP Notes that may address this specific error or provide additional guidance.
Related Information:
By following these steps, you should be able to identify the root cause of the PSSC_NET199 error and implement a solution.
Get instant SAP help. Start your 7-day free trial now.
PSSC_NET198
Next due date for net calculation ex. &1 must not be lower than period &2
What causes this issue? The next due date for net calculation has been calculated as &V1& using the due date rule &V3&. The date &...
PSSC_NET197
Execution date for net calculation can not be determined for period &3
What causes this issue? The execution date of a follow up net calculation could not be determined for net calculation unit period &V3&. The i...
PSSC_NET200
Item &2 of GPD &1 has already been net calculated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSSC_NET201
Two pred. NCDs &1 / &2 are active for the same payment period &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.