How To Fix PSSC_NET131 - Due date for net calculation limitation &1 must not be lower as period &2


PSSC_NET131 - Overview

  • Message type: E = Error

  • Message class: PSSC_NET - Net Calculation

  • Message number: 131

  • Message text: Due date for net calculation limitation &1 must not be lower as period &2

  • Show details Hide details
  • What causes this issue?

    The next due date for net calculation limitation has been calculated as
    &V1& using the due date rule &V3&.
    The determined date &V1& must not be before period &V2&. Net calculation
    limitation is intended to take place in advance.

    System Response

    The net calculation processing cannot be executed.

    How to fix this error?

    Contact your system administrator.

    Procedure for System Administrators

    Regarding the period &V2& (end date: 31.12.9999), the evalulation of the
    due date rule &V3& must lead to a date which is not lower than the begin
    date.
    Correct the implementation of the due date rule &V1& or assign a
    suitable due date rule. The due date rule should not refer to the end
    date and should provide a due date greater or equal to the begin date.
    The system provides the actual date SY-DATLO as begin date.
    For more information, see
    <DS:DE.PSSC_DUE_DATE_NC_LIMITATION>due date net calculation limitation
    </>.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PSSC_NET131 - Due date for net calculation limitation &1 must not be lower as period &2 ?
    The SAP error message PSSC_NET131 indicates that there is an issue with the due date for net calculation in relation to a specified period. This error typically arises in the context of financial or project management modules where net calculations are performed based on certain periods and due dates.
    
    Cause: The error occurs when the due date for net calculation is set to a value that is lower than the defined period. This can happen due to: Incorrect Configuration: The settings for net calculation periods may not be aligned with the due dates defined in the system. Data Entry Errors: Users may have entered a due date that does not comply with the expected range or logic of the system. Business Rules Violation: The business rules governing the net calculation may dictate that the due date must always be equal to or greater than the specified period.
    Solution: To resolve the PSSC_NET131 error, you can take the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker