How To Fix PSSC_GROSS136 - Delimitation check: A GPI attempts to delimit an already due payment (&2)


PSSC_GROSS136 - Overview

  • Message type: E = Error

  • Message class: PSSC_GROSS - Gross Entitlement and Payment

  • Message number: 136

  • Message text: Delimitation check: A GPI attempts to delimit an already due payment (&2)

  • Show details Hide details
  • What causes this issue?

    You triggered an activity during which the historic gross payment
    document (GPD) item &V3& should have been delimited by an item of this
    actual calculation. This activity was stopped because the part of the
    item &V3& that should have been delimited represents a past payment.
    Delimitation of GPD items is only possible for future parts of a GPD
    item.
    This situation only occurs in scenarios where a payment frequency was
    changed in the sequence of follow-up decisions. All entitlements until
    &V2& potentially delimit payment items that are already due, and hence
    may result in the same exception.

    System Response

    The current calculation was stopped.

    How to fix this error?

    Depending on the scenario, the following options are available:
    Scenario 1: First GPD with a new payment frequency in a sequence of
    follow-up decisions
    Change the decision period, so that the calculation period of the actual
    gross payment calculation starts after &V2&.
    Scenario 2: For GPDs following a GPD with a new payment frequency
    Postpone with the actual calculation until the actual break-date is
    later than &V2&.
    Given the precondition that all older gross payment items (GPIs) were
    delimited within scenario 1, you should be able to execute any GPIs (for
    example, without any time constraints) in scenario 2.

    Procedure for System Administrators

    &V2& = actual break-date of the historic GPD (holding item &V3&)
    &V3& = historic GPI

    Error message extract from SAP system. Copyright SAP SE.


PSSC_GROSS136 - Details

  • The SAP error message PSSC_GROSS136 indicates that there is an issue with a Global Payment Instruction (GPI) attempting to delimit a payment that is already due. This typically occurs in the context of payment processing within SAP, particularly in the Financial Supply Chain Management (FSCM) or Treasury modules.
    
    Cause: The error arises when a GPI tries to modify or delimit a payment that has already reached its due date. This can happen due to several reasons: Timing Issues: The GPI is being processed after the payment has already been scheduled or is due. Incorrect Configuration: There may be configuration issues in the payment processing settings that allow for delimitation attempts on due payments. Data Integrity Issues: There might be inconsistencies in the data related to the payment or GPI that prevent the system from processing the delimitation correctly.
    Solution: To resolve this error, consider the following steps: Check Payment Status: Verify the status of the payment in question.

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PSSC_GROSS136 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker