How To Fix PSS4_MSG151 - Project Currency was derived from Responsible Cost Center


PSS4_MSG151 - Overview

  • Message type: E = Error

  • Message class: PSS4_MSG - Message class for simplified Projects

  • Message number: 151

  • Message text: Project Currency was derived from Responsible Cost Center

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PSS4_MSG151 - Project Currency was derived from Responsible Cost Center ?
    The SAP error message PSS4_MSG151, which states "Project Currency was derived from Responsible Cost Center," typically occurs in the context of project management and cost accounting within SAP. This message indicates that the project currency for a specific project is being derived from the responsible cost center, which may not align with the expected configuration or data entry.
    
    Cause: Cost Center Configuration: The responsible cost center for the project may have a different currency than what is expected for the project. This can happen if the cost center is set up in a different currency than the project currency. Project Definition: The project may not have been defined correctly, or the currency settings in the project definition may not match the currency settings of the responsible cost center. Currency Settings: The system may be configured to derive the project currency from the cost center, and if there is a mismatch, this error will occur.
    Solution: Check

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages: