How To Fix PSB_API_MSGCL134 - Duration cannot be changed if the calculation key is "Calculate Duration"


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PSB_API_MSGCL -

  • Message number: 134

  • Message text: Duration cannot be changed if the calculation key is "Calculate Duration"

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PSB_API_MSGCL134 - Duration cannot be changed if the calculation key is "Calculate Duration" ?
    The SAP error message PSB_API_MSGCL134 indicates that there is an issue with changing the duration of a project or task when the calculation key is set to "Calculate Duration." This typically occurs in the context of project management within SAP, particularly when using the Project System (PS) module.
    
    Cause: The error arises because the system is configured to automatically calculate the duration based on the start and finish dates of the project or task. When the calculation key is set to "Calculate Duration," the system expects the duration to be derived from these dates, and any manual changes to the duration are not allowed. This is a safeguard to ensure data integrity and consistency in project scheduling.
    Solution: To resolve this error, you have a couple of options: Change the Calculation Key: If you need to manually adjust the duration, you can change the calculation key from "Calculate Duration" to a different setting that allows manual

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant