Do you have any question about this error?
Message type: E = Error
Message class: PSB_API_MSGCL -
Message number: 128
Message text: WBS &1 does not belong to the loaded project
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PSB_API_MSGCL128
- WBS &1 does not belong to the loaded project ?The SAP error message PSB_API_MSGCL128 indicates that the Work Breakdown Structure (WBS) element you are trying to access or manipulate does not belong to the project that is currently loaded in the system. This can occur in various scenarios, such as when you are trying to perform operations related to project management, such as planning, budgeting, or reporting.
Cause
The error can be caused by several factors:
- Incorrect WBS Element: The WBS element you are trying to use may not be part of the project you have loaded. This could happen if you have entered the wrong WBS element ID.
- Project Not Loaded: The project associated with the WBS element may not be loaded in the current session.
- Authorization Issues: You may not have the necessary authorizations to access the specified WBS element or project.
- Data Consistency Issues: There may be inconsistencies in the project structure or data that prevent the system from recognizing the relationship between the WBS element and the project.
Solution
To resolve the error, you can take the following steps:
- Verify WBS Element: Double-check the WBS element ID you are using to ensure it is correct and belongs to the project you are working with.
- Load the Correct Project: Ensure that the correct project is loaded in your session. You can do this by navigating to the project management area and loading the appropriate project.
- Check Authorizations: Ensure that you have the necessary authorizations to access the project and the WBS element. You may need to contact your SAP security administrator if you suspect authorization issues.
- Review Project Structure: Check the project structure to ensure that the WBS element is correctly assigned to the project. You can do this by using transaction codes like CJ20N (Project Builder) to view the project hierarchy.
- Consult Documentation: If the issue persists, consult SAP documentation or support resources for further troubleshooting steps specific to your version of SAP.
Related Information
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PSB_API_MSGCL127
Activity not found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSB_API_MSGCL126
Enter a valid unit of work or duration
What causes this issue? You must enter valid units for the system to calculate the work or duration. Note that you can only enter the unit of work in...
PSB_API_MSGCL129
You cannot delete the short text for the logon language
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSB_API_MSGCL130
&1:&2 deleted
What causes this issue? This object was deleted in another session.System Response The system does not allow the saving of the data into the operati...
Click on this link to search all SAP messages.