How To Fix PSB_API_MSGCL093 - Changeable network does not belong to the initialized project


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PSB_API_MSGCL -

  • Message number: 093

  • Message text: Changeable network does not belong to the initialized project

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PSB_API_MSGCL093 - Changeable network does not belong to the initialized project ?
    The SAP error message PSB_API_MSGCL093 indicates that a changeable network does not belong to the initialized project. This error typically occurs in the context of project management and network planning within SAP, particularly when working with Project System (PS) or related modules.
    
    Cause: The error can arise due to several reasons: Incorrect Network Assignment: The network you are trying to modify or access is not assigned to the project you have initialized. This can happen if the network was created under a different project or if there was a mistake in the project structure. Project Initialization Issues: The project you are working on may not have been initialized correctly, or the network was not included in the initialization process. Authorization Issues: Sometimes, the user may not have the necessary authorizations to access or modify the network associated with the project.
    Solution: To resolve the error, you can take the following steps: Verify Network Assignment: Check if the network you

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker