How To Fix PSB_API_MSGCL058 - Draft structure and operative structure are not equal


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PSB_API_MSGCL -

  • Message number: 058

  • Message text: Draft structure and operative structure are not equal

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PSB_API_MSGCL058 - Draft structure and operative structure are not equal ?

    The SAP error message PSB_API_MSGCL058 indicates that there is a mismatch between the draft structure and the operative structure in the context of project system (PS) or project management. This error typically arises when there are inconsistencies in the data between the draft version of a project and its operative version, which can occur during various operations such as saving, releasing, or transferring project data.

    Cause:

    1. Data Inconsistency: The draft structure may have been modified (e.g., changes in WBS elements, activities, or other project-related data) without corresponding updates to the operative structure.
    2. Incomplete Data Transfer: If the project was copied or transferred from one environment to another, some data may not have been transferred correctly.
    3. User Modifications: Manual changes made by users in the draft version that are not reflected in the operative version can lead to this error.
    4. Configuration Issues: There may be configuration settings in the project system that are not aligned between the draft and operative structures.

    Solution:

    1. Check for Differences: Compare the draft structure and the operative structure to identify discrepancies. This can be done using transaction codes like CJ20N (Project Builder) or CJ02 (Change Project).
    2. Synchronize Structures: Ensure that any changes made in the draft are also applied to the operative structure. This may involve updating the operative version to match the draft.
    3. Use the Correct Transaction: If you are trying to save or release a project, ensure you are using the correct transaction and that all necessary fields are filled out correctly.
    4. Recreate the Draft: If the draft structure is significantly out of sync, consider recreating the draft from the operative structure to ensure consistency.
    5. Consult Documentation: Review SAP documentation or notes related to this error message for any specific guidance or patches that may address the issue.
    6. Contact SAP Support: If the issue persists and cannot be resolved through the above steps, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ02 (Change Project), and CJ03 (Display Project) to manage project structures effectively.
    • SAP Notes: Check for any SAP Notes that may address this specific error message or provide additional troubleshooting steps.
    • User Roles and Authorizations: Ensure that the user has the necessary authorizations to make changes to both the draft and operative structures.
    • Testing in a Sandbox: If possible, replicate the issue in a sandbox environment to test potential solutions without affecting production data.

    By following these steps, you should be able to identify and resolve the cause of the PSB_API_MSGCL058 error in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant