How To Fix PS_BILLING006 - End of processing project &1.


PS_BILLING006 - Overview

  • Message type: E = Error

  • Message class: PS_BILLING - Message class for Customer Project Billing Proposal App

  • Message number: 006

  • Message text: End of processing project &1.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PS_BILLING006 - End of processing project &1. ?
    The SAP error message PS_BILLING006 ("End of processing project &1") typically occurs in the context of project billing within the SAP Project System (PS) module. This error indicates that there is an issue with the billing process for a specific project, which is identified by the project number (&1).
    Causes:
    
    Incomplete Data: The project may have incomplete or missing data required for billing, such as missing billing elements or unprocessed transactions.
    Billing Block: There may be a billing block set on the project or specific items within the project, preventing billing from being processed.
    Status Issues: The project or its components may be in a status that does not allow billing (e.g., "Not Ready for Billing").
    
    Configuration Issues: There may be configuration settings in the project system that are not aligned with the billing requirements. Document Flow: There may be issues with the document flow, such as missing or incomplete predecessor documents that are required for

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker