Do you have any question about this error?
Message type: E = Error
Message class: PS - SAP Electronic Parcel Service
Message number: 259
Message text: *#º
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PS259
- *#º ?The SAP error message PS259 typically relates to issues in the Project System (PS) module, often indicating a problem with the assignment of a project or a related object. The specific message may vary based on the context, but it generally points to a configuration or data issue.
Cause:
- Missing or Incorrect Assignment: The project or WBS (Work Breakdown Structure) element may not be correctly assigned to a controlling area or may not exist.
- Authorization Issues: The user may not have the necessary authorizations to access or modify the project.
- Data Inconsistencies: There may be inconsistencies in the master data or transaction data related to the project.
- Configuration Issues: The system configuration for the Project System module may not be set up correctly.
Solution:
- Check Project Assignment: Verify that the project or WBS element is correctly assigned to the appropriate controlling area. You can do this by navigating to the project in the Project Builder (CJ20N) and checking the assignment details.
- Review Authorizations: Ensure that the user has the necessary authorizations to access and modify the project. This can be checked in the user roles and profiles.
- Data Consistency Check: Run consistency checks for the project data to identify any discrepancies. You can use transaction codes like CJEN (for project structure) or CJE1 (for project data).
- Configuration Review: If the issue persists, review the configuration settings for the Project System module. This may involve checking the settings in SPRO (SAP Reference IMG) related to project management.
- Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional troubleshooting steps.
Related Information:
Always ensure to back up any critical data before making changes to the system configuration or project data.
Get instant SAP help. Start your 7-day free trial now.
PS258
*#º
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PS257
*#º
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PS260
*#º
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PS261
*#º
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.