Do you have any question about this error?
Message type: E = Error
Message class: PS - SAP Electronic Parcel Service
Message number: 099
Message text: *#º
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PS099
- *#º ?The SAP error message PS099 typically indicates an issue related to project system (PS) functionality, often involving project definitions, WBS elements, or related master data. The specific message may vary based on the context in which it appears, but it generally points to a problem with project management data.
Possible Causes:
- Missing or Incomplete Data: The project definition or WBS element may be missing required information.
- Incorrect Status: The project or WBS element may be in a status that does not allow certain actions (e.g., locked, closed).
- Authorization Issues: The user may not have the necessary permissions to access or modify the project data.
- Configuration Issues: There may be a configuration problem in the project system settings.
- Data Consistency Issues: There could be inconsistencies in the data that need to be resolved.
Solutions:
- Check Project Data: Verify that all required fields in the project definition or WBS element are filled out correctly.
- Review Status: Ensure that the project or WBS element is in the correct status for the action you are trying to perform.
- Authorization Check: Confirm that you have the necessary authorizations to access and modify the project data.
- Configuration Review: Consult with your SAP administrator to check if there are any configuration issues in the project system settings.
- Data Consistency Check: Use transaction codes like CJ20N or CJ03 to review the project structure and ensure that all data is consistent and complete.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or refer to SAP community forums for additional assistance.
Get instant SAP help. Start your 7-day free trial now.
PS098
*#º
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PS097
*#º
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PS100
RFC connection failed
What causes this issue? An error occurred when setting up the network connection. Server destination: <LS>&V3&</> Error code: ...
PS101
Could not set up connection to server
What causes this issue? An error occurred when connecting to the server. Server address: <LS>&V2&</> Server destination: <...
Click on this link to search all SAP messages.