Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix PRS042 - Refresh of Carry Over lines failed. Lines were recreated


PRS042 - Overview

  • Message type: E = Error

  • Message class: PRS - Message class for PROF_SERV packages.

  • Message number: 042

  • Message text: Refresh of Carry Over lines failed. Lines were recreated

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PRS042 - Details

  • The SAP error message PRS042, which states "Refresh of Carry Over lines failed. Lines were recreated," typically occurs in the context of project management and planning within SAP, particularly when dealing with project structures and their associated carry-over lines in the Project System (PS) module.
    
    Cause: Data Inconsistency: The error often arises due to inconsistencies in the data related to project structures, such as missing or incorrect entries in the project definition or WBS (Work Breakdown Structure) elements. System
    Configuration Issues: There may be configuration issues in the system that prevent the proper refresh of carry-over lines. Locked Entries: If certain entries are locked or if there are ongoing transactions that affect the carry-over lines, this can lead to the failure of the refresh process. Missing Authorizations: Users may not have the necessary authorizations to perform the refresh operation, leading to this error.
    Solution: Check Data Consistency: Verify the integrity of the project data. Ensure that all

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PRS042 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker