How To Fix PRP075 - Finish is after the WFM Core maximum date &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PRP - Project Resource Planning: General Messages

  • Message number: 075

  • Message text: Finish is after the WFM Core maximum date &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PRP075 - Finish is after the WFM Core maximum date & ?

    The SAP error message PRP075, which states "Finish is after the WFM Core maximum date," typically occurs in the context of production planning and scheduling within SAP. This error indicates that the finish date of a production order or a related process exceeds the maximum date allowed by the Workforce Management (WFM) Core settings.

    Cause:

    1. Date Configuration: The maximum date in the WFM Core settings is configured to limit the scheduling of tasks or orders to a specific timeframe. If the finish date of a production order exceeds this limit, the error will be triggered.
    2. Incorrect Planning: The planning data for the production order may have been incorrectly set, leading to unrealistic finish dates.
    3. System Settings: The system may have been configured with overly restrictive date limits that do not align with the actual production timelines.

    Solution:

    1. Check WFM Core Settings: Review the maximum date settings in the WFM Core configuration. You may need to adjust these settings to allow for later finish dates if your production processes require it.

      • Navigate to the relevant configuration settings in SAP and increase the maximum date limit.
    2. Review Production Order Dates: Check the production order or related task to ensure that the finish date is realistic and within the allowed range. If necessary, adjust the dates to fall within the permissible limits.

    3. Adjust Planning Parameters: If the production order is part of a larger planning scenario, review the planning parameters and ensure they are set correctly to avoid scheduling conflicts.

    4. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on managing date settings and resolving scheduling errors.

    5. Contact SAP Support: If the issue persists after making adjustments, consider reaching out to SAP support for further assistance, especially if it involves complex configurations or customizations.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional context on how to manage date settings in WFM.
    • User Forums: Engage with SAP user communities or forums where similar issues may have been discussed, and solutions shared.
    • Training: Consider training sessions or workshops on SAP production planning and scheduling to better understand how to manage dates and configurations effectively.

    By addressing the configuration and planning aspects, you should be able to resolve the PRP075 error and ensure that your production scheduling aligns with the system's capabilities.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker