How To Fix PROJECT_REPLICATION020 - No work center assignment was found for person &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PROJECT_REPLICATION - Messages Related to cProjects-PS Replication

  • Message number: 020

  • Message text: No work center assignment was found for person &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PROJECT_REPLICATION020 - No work center assignment was found for person & ?

    The SAP error message PROJECT_REPLICATION020 indicates that there is no work center assignment found for a specific person in the context of project replication. This error typically arises when trying to replicate project-related data, such as when a project manager or team member is assigned to a project but lacks a corresponding work center assignment in the system.

    Cause:

    1. Missing Work Center Assignment: The person (employee) does not have a work center assigned in the system. This could be due to incorrect or incomplete master data setup.
    2. Incorrect Personnel Number: The personnel number provided may be incorrect or not exist in the system.
    3. Data Inconsistencies: There may be inconsistencies in the data between the project and the employee master data.
    4. Authorization Issues: The user may not have the necessary authorizations to view or assign work centers.

    Solution:

    1. Check Work Center Assignment:

      • Go to the employee master data (transaction code PA30) and check if the work center is assigned to the employee.
      • If not, assign the appropriate work center to the employee.
    2. Verify Personnel Number:

      • Ensure that the personnel number used in the project replication is correct and corresponds to an existing employee in the system.
    3. Update Master Data:

      • If the work center assignment is missing, update the employee's master data to include the correct work center.
    4. Check Project Settings:

      • Review the project settings to ensure that they are correctly configured to allow for the assignment of employees to work centers.
    5. Authorization Check:

      • Ensure that the user performing the replication has the necessary authorizations to access and modify work center assignments.
    6. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on project replication and work center assignments.

    Related Information:

    • Transaction Codes:

      • PA30 (Maintain HR Master Data)
      • CJ20N (Project Builder)
      • CJI3 (Project Actual Line Items)
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.

    • Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    By following these steps, you should be able to resolve the PROJECT_REPLICATION020 error and ensure that the necessary work center assignments are in place for the personnel involved in the project.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant