How To Fix PROD_ALLOC_SEQUENCE006 - Material-plant cannot be changed: sequence is already in use.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PROD_ALLOC_SEQUENCE - T100 Messages for BO Product Allocation Sequence

  • Message number: 006

  • Message text: Material-plant cannot be changed: sequence is already in use.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PROD_ALLOC_SEQUENCE006 - Material-plant cannot be changed: sequence is already in use. ?

    The SAP error message PROD_ALLOC_SEQUENCE006 indicates that there is an attempt to change the material-plant assignment for a production allocation sequence that is already in use. This typically occurs in the context of production planning and allocation processes where certain sequences are locked or in use, preventing modifications.

    Cause:

    1. Active Production Orders: The material-plant combination is linked to active production orders or allocations that are currently being processed.
    2. Locked Sequences: The sequence you are trying to change is locked because it is being referenced in other transactions or processes.
    3. Data Integrity: SAP enforces data integrity rules to prevent changes that could lead to inconsistencies in production planning and execution.

    Solution:

    1. Check Active Orders: Review the production orders or allocations that are currently using the sequence. You can do this by navigating to the relevant transaction codes (e.g., CO03 for production orders) and checking the status of the orders.
    2. Complete or Cancel Orders: If possible, complete or cancel the active production orders that are using the sequence. This will release the lock on the material-plant combination.
    3. Use a Different Sequence: If changing the material-plant assignment is necessary, consider using a different sequence that is not currently in use.
    4. Consult with Your Team: If you are unsure about the implications of changing the sequence, consult with your production planning or logistics team to understand the impact on ongoing processes.
    5. Check for Batch Jobs: Sometimes, batch jobs or background processes may be using the sequence. Ensure that no such jobs are running that could be causing the lock.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CO03 (Display Production Order), CO02 (Change Production Order), and MD04 (Stock/Requirements List) to analyze the situation.
    • SAP Notes: Check SAP Notes for any known issues or updates related to this error message. SAP frequently releases notes that may provide additional context or solutions.
    • User Authorization: Ensure that you have the necessary authorizations to make changes to production allocations and sequences.
    • Documentation: Review SAP documentation or training materials related to production planning and allocation processes for a better understanding of how sequences are managed.

    By following these steps, you should be able to resolve the error and proceed with your production planning activities.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant