How To Fix PRJ_CIF_LOG053 - Activity &1 / &2 has remaining work, but duration is zero


PRJ_CIF_LOG053 - Overview

  • Message type: E = Error

  • Message class: PRJ_CIF_LOG - CIF Application Log Messages for Networks

  • Message number: 053

  • Message text: Activity &1 / &2 has remaining work, but duration is zero

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PRJ_CIF_LOG053 - Activity &1 / &2 has remaining work, but duration is zero ?
    The SAP error message PRJ_CIF_LOG053 indicates that there is a discrepancy in the project data where an activity has remaining work but its duration is set to zero. This situation can arise in project management scenarios, particularly when using the SAP Project System (PS) and the integration with other modules like SAP Advanced Planning and Optimization (APO).
    
    Cause: Data Inconsistency: The most common cause of this error is a data inconsistency where the system has recorded remaining work for an activity, but the duration of that activity is set to zero. This can happen due to manual data entry errors or issues during data transfer between systems (e.g., between SAP ERP and SAP APO). Incorrect Planning: If the activity was planned incorrectly, it might have been assigned remaining work without a proper duration being defined. Changes in Activity: If changes were made to the activity (like changing the status or reassigning resources) without properly

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author