Do you have any question about this error?
Message type: E = Error
Message class: PRC_PRI - Messages for Pricing Engine
Message number: 703
Message text: Level number &1 invalid
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PRC_PRI703
- Level number &1 invalid ?The SAP error message PRC_PRI703, which states "Level number &1 invalid," typically occurs in the context of project management or project system modules within SAP. This error indicates that the level number specified in a particular transaction or process is not valid or recognized by the system.
Cause:
- Invalid Level Number: The level number provided in the transaction does not exist in the system. This could be due to a typo or an incorrect reference.
- Configuration Issues: The project structure or hierarchy may not be properly configured, leading to invalid level references.
- Data Integrity Issues: There may be inconsistencies in the data, such as missing or incorrectly defined project levels.
- Authorization Issues: Sometimes, the user may not have the necessary authorizations to access certain levels, leading to this error.
Solution:
- Check Level Number: Verify the level number you are trying to use. Ensure that it is correctly entered and exists in the system.
- Review Project Structure: Go to the project structure and confirm that the levels are correctly defined and configured. You can do this by navigating to the project definition in the Project System (PS) module.
- Data Consistency Check: Run data consistency checks to identify any discrepancies in the project data. This can help in identifying missing or incorrect entries.
- Authorization Check: Ensure that the user has the necessary authorizations to access the specified level. You may need to consult with your SAP security team to verify this.
- Consult Documentation: Refer to SAP documentation or help files related to the specific module you are working with for additional guidance on level numbers and their configurations.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to contact your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PRC_PRI701
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PRC_PRI700
Cannot access cache region &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PRC_PRI704
Counter &1 invalid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PRC_PRI708
Condition type &1: Condition value &2 invalid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.