How To Fix PRC_PRI002 - Buffer synchronization completed.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PRC_PRI - Messages for Pricing Engine

  • Message number: 002

  • Message text: Buffer synchronization completed.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PRC_PRI002 - Buffer synchronization completed. ?

    The SAP error message PRC_PRI002, which states "Buffer synchronization completed," typically occurs in the context of the SAP Project System (PS) or Project Management (PM) modules. This message is not necessarily an error but rather an informational message indicating that the buffer synchronization process has been completed.

    Cause:

    1. Buffer Synchronization: This message is related to the synchronization of data buffers in the SAP system. It can occur during various operations, such as when data is being updated or when transactions are being processed that require the system to synchronize data between the database and the application layer.
    2. System Performance: It may also indicate that the system is performing optimally, and the buffers are being managed correctly.

    Solution:

    Since PRC_PRI002 is an informational message rather than an error, there is typically no direct action required. However, if you are experiencing issues related to project management or if this message is appearing frequently and impacting performance, consider the following steps:

    1. Monitor System Performance: Check the overall performance of the SAP system. If you notice slowdowns or other issues, it may be worth investigating further.
    2. Review Buffer Settings: Ensure that the buffer settings in your SAP system are configured correctly. This can involve checking the parameters related to buffer sizes and synchronization intervals.
    3. Check for Related Errors: Look for other error messages or warnings that may accompany PRC_PRI002. These could provide more context about any underlying issues.
    4. Consult SAP Notes: Search the SAP Support Portal for any relevant SAP Notes that may address specific issues related to buffer synchronization or performance in your version of SAP.
    5. System Administration: If you are a system administrator, you may want to review the system logs and performance metrics to ensure that everything is functioning as expected.

    Related Information:

    • SAP Documentation: Refer to the official SAP documentation for your specific version of the software for more detailed information on buffer management and synchronization.
    • SAP Community: Engage with the SAP Community forums to see if other users have encountered similar messages and what solutions they may have found.
    • SAP Support: If the message is causing significant issues or if you suspect a deeper problem, consider reaching out to SAP Support for assistance.

    In summary, PRC_PRI002 is generally an informational message indicating that buffer synchronization has been completed, and while it does not require immediate action, monitoring system performance and reviewing configurations may be beneficial.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author