How To Fix /PRA/PN126 - Resource wait; for group &1, for &2


/PRA/PN126 - Overview

  • Message type: E = Error

  • Message class: /PRA/PN -

  • Message number: 126

  • Message text: Resource wait; for group &1, for &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/PRA/PN126 - Details

  • The SAP error message /PRA/PN126 Resource wait; for group &1, for &2 typically indicates that a resource is currently unavailable or locked, causing a wait condition for a specific group or process. This error is often encountered in the context of production planning or resource management within SAP.
    
    Cause: Resource Locking: The resource (e.g., machine, labor, etc.) is currently being used by another process or transaction, leading to a lock. Insufficient Resources: The required resources for the operation are not available, either due to scheduling conflicts or resource allocation issues.
    Configuration Issues: There may be configuration problems in the resource management settings or in the production planning module. System Performance: High system load or performance issues can lead to delays in resource availability.
    Solution: Check Resource Availability: Verify if the resource is currently in use by another process. You can do this by checking the resource utilization in the system. Release Locks: If the resource is locked, identify

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/PRA/PN126 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker