Do you have any question about this error?
Message type: E = Error
Message class: PPH_MRP -
Message number: 213
Message text: Production versions for BOM explosion not supported in MRP Live on HANA
The system does not yet support selection of production versions using
quota arrangements during BOM explosion.
The system plans the material in classic MRP (ABAP).
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPH_MRP213
- Production versions for BOM explosion not supported in MRP Live on HANA ?The SAP error message PPH_MRP213 indicates that production versions for Bill of Materials (BOM) explosion are not supported in MRP Live when using SAP HANA. This error typically arises during the Material Requirements Planning (MRP) process when the system attempts to explode a BOM that is configured with production versions.
Cause:
- Production Versions: The error occurs because MRP Live does not support the use of production versions for BOM explosion. In traditional MRP, production versions can be used to determine which BOM to use based on the production version assigned to a material. However, MRP Live has certain limitations regarding this feature.
- Configuration Issues: There may be configuration settings in the system that are not aligned with the requirements for MRP Live processing.
- Material Master Settings: The material master data may not be set up correctly, particularly in relation to the BOM and production versions.
Solution:
- Use Classic MRP: If production versions are essential for your BOM explosion, consider running the classic MRP (transaction MD01) instead of MRP Live (transaction MD02). This will allow the system to process BOMs with production versions.
- Adjust BOM Configuration: If possible, adjust the BOM configuration to not rely on production versions. This may involve creating a single BOM without production versions or using alternative methods for BOM determination.
- Check Material Master Data: Ensure that the material master data is correctly configured. Verify that the BOMs are correctly assigned and that there are no inconsistencies in the production version settings.
- SAP Notes and Support: Check for any relevant SAP Notes that may address this issue. SAP frequently releases updates and patches that may resolve known issues or provide additional functionality.
- Consult Documentation: Review the SAP documentation for MRP Live to understand its limitations and best practices. This can provide insights into how to structure your BOMs and production processes to avoid such errors.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to engage with SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PPH_MRP212
MRP Live on HANA technical error - expected material not found in RTO: &1
What causes this issue? A program error occurred. Error while generating the runtime object: The expected material does not exist in the runtime obje...
PPH_MRP211
MRP Live on HANA does not support VC change of BOM item field: &1
What causes this issue? You tried to change one of the following fields using variant configuration: IDNRK - BOM Component ITSOB - Special procuremen...
PPH_MRP214
Configurable matls cannot be planned with MRP Live on HANA: VC not active
What causes this issue? The business function <ZK>Low-Level Variant Configuration with SAP HANA </>(<ZK>PLM_VCH_LL_HANA</>) h...
PPH_MRP215
Configd matls produced in-house cannot be planned in MRP Live on HANA
What causes this issue? The business function <ZK>Low-Level Variant Configuration with SAP HANA </>(<ZK>PLM_VCHLL_HANA</>) ha...
Click on this link to search all SAP messages.