Do you have any question about this error?
Message type: E = Error
Message class: PPH_MRP -
Message number: 163
Message text: Material is to be planned by external system
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPH_MRP163
- Material is to be planned by external system ?The SAP error message PPH_MRP163 indicates that a material is set to be planned by an external system rather than by the SAP system itself. This typically occurs in environments where materials are managed through an external planning system, such as a third-party supply chain management tool or an advanced planning system (APS).
Cause:
- External Planning Configuration: The material is configured in the system to be planned externally. This is often set in the material master data or in the planning settings.
- MRP Type: The MRP type for the material may be set to a type that indicates external planning (e.g., "X" for external planning).
- Master Data Settings: The material master record may have specific settings that direct the planning to an external system.
- Integration Issues: There may be issues with the integration between SAP and the external planning system, leading to the system not recognizing the material for internal planning.
Solution:
Check Material Master Data:
- Go to the material master (transaction code MM03) and check the MRP views. Look for the MRP type and planning settings.
- If the material should be planned internally, change the MRP type to an appropriate value (e.g., "PD" for MRP) and save the changes.
Review Planning Parameters:
- Ensure that the planning parameters are correctly set up in the configuration for the material. This includes checking the MRP type, lot size, and other relevant settings.
Consult with External System:
- If the material is indeed meant to be planned externally, ensure that the external system is correctly configured and that there are no issues with data transfer or integration.
Check for Customizations:
- If there are custom developments or enhancements in your SAP system, check if any of these are affecting the planning behavior of the material.
Documentation and Support:
- Refer to SAP documentation or consult with your SAP support team for specific guidance related to your system configuration and integration with external systems.
Related Information:
By following these steps, you should be able to resolve the PPH_MRP163 error and ensure that the material is planned according to your business requirements.
Get instant SAP help. Start your 7-day free trial now.
PPH_MRP162
Only strategy group blank and '10' supported in MRP Live on HANA
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP161
MRP procedure &1 not supported in MRP Live on HANA
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP164
Material manually set to planning in classic MRP
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP165
Optimum lot-sizing procedure not supported by MRP Live on SAP HANA
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.