How To Fix PPH_MRP131 - Never planned


PPH_MRP131 - Overview

  • Message type: E = Error

  • Message class: PPH_MRP -

  • Message number: 131

  • Message text: Never planned

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PPH_MRP131 - Details

  • The SAP error message PPH_MRP131, which indicates "Never planned," typically occurs in the context of Material Requirements Planning (MRP) when the system is unable to generate a planning proposal for a specific material. This can happen for various reasons, and understanding the cause is essential for resolving the issue.
    Causes of PPH_MRP131 - Never Planned
    
    
    Material Master Data Issues:
    
    The material may not be set up correctly in the material master. For example, the MRP type might be set to "ND" (not relevant for planning), or the material might be marked as "not relevant for MRP."
    
    
    
    MRP Parameters:
    
    The planning parameters for the material might not be configured correctly. This includes settings like lot size, safety stock, and reorder point.
    
    
    
    Planning Scope:
    
    The planning scope might not include the material in question. This can happen if the material is not assigned to the correct planning group or if the planning version is not active.
    
    
    
    Stock Availability:
    
    If there is

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PPH_MRP131 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker