How To Fix PPH_MRP113 - MRP date: &1


PPH_MRP113 - Overview

  • Message type: E = Error

  • Message class: PPH_MRP -

  • Message number: 113

  • Message text: MRP date: &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PPH_MRP113 - Details

  • The SAP error message PPH_MRP113 typically relates to issues encountered during the Material Requirements Planning (MRP) process. This error message indicates that there is a problem with the MRP date specified in the planning run. Here’s a breakdown of the cause, potential solutions, and related information:
    
    Cause: Invalid MRP Date: The MRP date specified may be outside the permissible range or not aligned with the planning parameters.
    Configuration Issues: There may be configuration settings in the MRP that are not set correctly, leading to the error. Master Data Issues: Problems with material master data, such as missing or incorrect planning data, can trigger this error. Planning Horizon: The planning horizon may not be set correctly, causing the MRP run to reference dates that are not valid.
    Solution: Check MRP Date: Verify the MRP date being used in the planning run. Ensure it falls within the acceptable range defined in your system. Review MRP Configuration: Check the configuration settings

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PPH_MRP113 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant