How To Fix PPH_MRP109 - Number of selected material-plant combinations: &1 (MRP Live on HANA)


PPH_MRP109 - Overview

  • Message type: E = Error

  • Message class: PPH_MRP -

  • Message number: 109

  • Message text: Number of selected material-plant combinations: &1 (MRP Live on HANA)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PPH_MRP109 - Details

  • The SAP error message PPH_MRP109 typically indicates that the number of selected material-plant combinations for a Material Requirements Planning (MRP) run exceeds the system's limits. This can occur when you are trying to process a large number of materials in a single MRP run, especially when using MRP Live on HANA.
    
    Cause: Exceeding Limits: The error is triggered when the number of material-plant combinations exceeds the predefined limit set in the system. This limit is often configured to prevent performance issues during MRP runs. Configuration Settings: The system may have specific settings that restrict the number of materials that can be processed in one go. Data Volume: A large volume of data being processed can lead to this error, especially if the MRP run is not optimized.
    Solution: Reduce Selection: Try to reduce the number of material-plant combinations selected for the MRP run. You can do this by: Filtering the selection criteria to include fewer materials or

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PPH_MRP109 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author