How To Fix PPH_MRP032 - No resources available for planning


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPH_MRP -

  • Message number: 032

  • Message text: No resources available for planning

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPH_MRP032 - No resources available for planning ?

    The SAP error message PPH_MRP032: No resources available for planning typically occurs in the context of Material Requirements Planning (MRP) when the system cannot find any available resources (such as production capacity or work centers) to fulfill the planned production orders or requirements. This can happen for several reasons, and understanding the cause is crucial for resolving the issue.

    Causes:

    1. Capacity Constraints: The work centers may be fully booked or have insufficient capacity to handle the planned production.
    2. Resource Availability: The resources (machines, labor, etc.) may not be available due to maintenance, breakdowns, or other scheduling conflicts.
    3. Incorrect Planning Parameters: The planning parameters for the materials or resources may not be set correctly, leading to miscalculations in availability.
    4. Master Data Issues: There may be issues with the master data, such as incorrect or missing work center assignments, production versions, or routing information.
    5. Time Periods: The planning horizon may not include the time periods when resources are available.
    6. Production Orders: Existing production orders may be consuming all available capacity, leaving no room for new planning.

    Solutions:

    1. Check Work Center Capacity: Review the capacity planning for the relevant work centers. Ensure that they have enough capacity to meet the production requirements.
    2. Adjust Planning Parameters: Verify and adjust the planning parameters for the materials and resources involved. This includes lead times, lot sizes, and safety stock levels.
    3. Review Master Data: Ensure that all relevant master data (work centers, routings, production versions) is correctly maintained and up to date.
    4. Analyze Existing Orders: Check for existing production orders that may be consuming all available capacity. Consider rescheduling or adjusting these orders if necessary.
    5. Extend Planning Horizon: If the planning horizon is too short, consider extending it to include periods when resources are available.
    6. Resource Availability Check: Perform a resource availability check to identify any potential conflicts or issues with resource allocation.

    Related Information:

    • Transaction Codes: You can use transaction codes like CM01 (Capacity Planning) or MD04 (Stock/Requirements List) to analyze capacity and requirements.
    • MRP Settings: Review the MRP settings in the material master (transaction MM02) to ensure they are configured correctly.
    • Capacity Evaluation: Use transaction CR01 to check the details of work centers and their capacity.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.

    By systematically addressing these areas, you should be able to identify the root cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant