Message type: E = Error
Message class: PPH_MRP -
Message number: 012
Message text: MRP run finished at &1 &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPH_MRP012
- MRP run finished at &1 &2 ?The SAP error message PPH_MRP012 indicates that the MRP (Material Requirements Planning) run has finished, but it has encountered issues that need to be addressed. This message typically appears in the context of the MRP process, which is crucial for planning and managing inventory levels, production schedules, and procurement.
Cause: The error message PPH_MRP012 can be caused by several factors, including:
Configuration Issues: Incorrect settings in the MRP configuration can lead to errors during the planning run. Master Data Problems: Missing or incorrect master data (like material master records, BOMs, or routing) can cause the MRP run to fail or produce incorrect results. Stock Levels: Issues with stock levels, such as negative stock or stock not being available when required, can lead to errors. Planning Parameters: Incorrect planning parameters or settings in the MRP profile can affect the outcome of the MRP run. Resource Constraints: If there are constraints on resources (like production capacity), the MRP run
Get instant SAP help. Sign up for our Free Essentials Plan.
PPH_MRP011
Low-level code &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP010
Overall statistics
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP013
Tables changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP014
Runtime for splitting work sets: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.