How To Fix PPH_DD112 - Proposal start date for Product &1 Plant &2 MRP Area &3 is not valid


PPH_DD112 - Overview

  • Message type: E = Error

  • Message class: PPH_DD - Messages for Demand Driven

  • Message number: 112

  • Message text: Proposal start date for Product &1 Plant &2 MRP Area &3 is not valid

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPH_DD112 - Proposal start date for Product &1 Plant &2 MRP Area &3 is not valid ?
    The SAP error message PPH_DD112 indicates that there is an issue with the proposal start date for a specific product in a given plant and MRP area. This error typically arises in the context of production planning and material requirements planning (MRP) when the system is unable to process a proposal due to an invalid date.
    
    Cause: The error can be caused by several factors, including: Invalid Date Configuration: The proposal start date may fall outside of the valid date range defined in the system. This could be due to: The date being in the past or too far in the future. The date not aligning with the planning calendar or factory calendar settings. MRP Area Settings: The MRP area for the product may not be properly configured, leading to issues with date validation. Product Master Data: There may be inconsistencies or missing information in the product master data, such as the planning parameters or availability checks. Planning

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author