How To Fix PPH_DD089 - Lead Time Calc. Method &1 can not be set. Material not transfer relevant.


PPH_DD089 - Overview

  • Message type: E = Error

  • Message class: PPH_DD - Messages for Demand Driven

  • Message number: 089

  • Message text: Lead Time Calc. Method &1 can not be set. Material not transfer relevant.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPH_DD089 - Lead Time Calc. Method &1 can not be set. Material not transfer relevant. ?
    The SAP error message PPH_DD089 indicates that there is an issue with the lead time calculation method for a material that is not marked as transfer relevant. This typically occurs in the context of production planning and material management within SAP.
    
    Cause: The error arises when you attempt to set or change the lead time calculation method for a material that is not configured to be relevant for transfer. This can happen due to several reasons: Material Master Settings: The material in question may not be set up correctly in the material master. Specifically, the material type or the relevant views (like MRP view) may not be configured to allow for lead time calculations. Material Status: The material might have a status that prevents it from being used in certain planning processes.
    Configuration Issues: There may be configuration settings in the system that restrict the use of lead time calculation methods for certain materials.
    Solution: To resolve

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant