Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix PPEVS615 - No variance scheme exists


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEVS - Message of the variance scheme connection (VS) in iPPE

  • Message number: 615

  • Message text: No variance scheme exists

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEVS615 - No variance scheme exists ?

    The SAP error message PPEVS615 "No variance scheme exists" typically occurs in the context of SAP's Project System (PS) or Production Planning (PP) modules when the system is unable to find a variance scheme for a particular project or order. Variance schemes are used to determine how costs are calculated and reported, especially in the context of project accounting and controlling.

    Cause:

    1. Missing Variance Scheme: The most common cause of this error is that a variance scheme has not been defined for the project or order in question.
    2. Incorrect Configuration: The configuration settings for variance calculation may not be set up correctly in the system.
    3. Project/Order Type: The project or order type may not be linked to a valid variance scheme.
    4. Master Data Issues: There may be issues with the master data related to the project or order, such as missing or incorrect settings.

    Solution:

    1. Define a Variance Scheme:

      • Go to the configuration settings in SAP (Transaction code: SPRO).
      • Navigate to the relevant section for defining variance schemes (usually under Controlling > Product Cost Controlling > Variance Calculation).
      • Create or modify a variance scheme as needed.
    2. Assign Variance Scheme to Project/Order:

      • Ensure that the variance scheme is assigned to the relevant project or order type.
      • You can check this in the project definition or order master data.
    3. Check Configuration Settings:

      • Review the configuration settings for variance calculation to ensure they are set up correctly.
      • Make sure that the settings align with the requirements of your organization.
    4. Review Master Data:

      • Check the master data for the project or order to ensure that all necessary fields are filled out correctly.
      • Look for any inconsistencies or missing information that could lead to this error.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for more detailed guidance on variance schemes and their configuration.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CO02 (Change Production Order), and SPRO (Customizing).
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Roles and Authorizations: Ensure that the user has the necessary authorizations to access and modify variance schemes and related configurations.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP PS or PP modules for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker