How To Fix PPEVS612 - No variance scheme exists, or there is no valid historical status


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEVS - Message of the variance scheme connection (VS) in iPPE

  • Message number: 612

  • Message text: No variance scheme exists, or there is no valid historical status

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEVS612 - No variance scheme exists, or there is no valid historical status ?
    The SAP error message PPEVS612 indicates that there is no variance scheme available for the specific context you are working in, or that there is no valid historical status for the data you are trying to process. This error typically occurs in the context of SAP's Project System (PS) or Controlling (CO) modules, particularly when dealing with variance analysis or reporting.
    Causes:
    
    
    Missing Variance Scheme: The variance scheme that is required for the analysis is not defined in the system. This could be due to configuration issues or because the scheme has not been set up for the specific project or cost object.
    
    
    Invalid Historical Status: The historical status of the project or cost object may not be valid. This can happen if the project has not been properly closed or if there are inconsistencies in the data.
    
    
    
    Configuration Issues: There may be issues in the configuration of the controlling area, project definition, or

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker