How To Fix PPESTRUCT059 - The node name cannot be longer than 40 characters


PPESTRUCT059 - Overview

  • Message type: E = Error

  • Message class: PPESTRUCT - Messages for Structure Operations

  • Message number: 059

  • Message text: The node name cannot be longer than 40 characters

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPESTRUCT059 - The node name cannot be longer than 40 characters ?
    The SAP error message PPESTRUCT059 indicates that a node name in a certain structure exceeds the maximum allowed length of 40 characters. This error typically occurs in the context of SAP's Production Planning and Detailed Scheduling (PP/DS) or similar modules where hierarchical structures (like product trees or planning hierarchies) are used.
    
    Cause: The primary cause of this error is that a node name (which could refer to a product, resource, or any other entity in the planning structure) has been defined with a name that exceeds the 40-character limit. This can happen during the creation or modification of planning objects, where the naming conventions or input data do not adhere to the specified constraints.
    Solution: To resolve this error, you can take the following steps: Identify the Node: Determine which node is causing the error. This may involve checking the logs or the specific transaction where the error occurred. Modify the Node Name: Once you identify

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant