Do you have any question about this error?
Message type: E = Error
Message class: PPESNP - Message Class for SNP Routing
Message number: 029
Message text: Selected activity &1 is not assigned to a component
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPESNP029
- Selected activity &1 is not assigned to a component ?The SAP error message PPESNP029 indicates that a selected activity (such as a production operation or task) is not assigned to a component in the context of production planning or execution. This error typically arises in the Production Planning (PP) module when there is a mismatch between the activities defined in the routing or production order and the components listed in the bill of materials (BOM).
Cause:
- Missing Assignment: The activity you are trying to use is not linked to any component in the routing or BOM.
- Incorrect Routing: The routing may not be correctly defined, or the activity may not be included in the routing for the specific material.
- Data Inconsistency: There may be inconsistencies in the master data, such as the routing or BOM not being updated after changes were made.
- Incorrect Configuration: The configuration settings in the production order or the planning parameters may not align with the defined activities and components.
Solution:
Check Routing: Verify that the routing for the material includes the selected activity. You can do this by navigating to the routing in the SAP system and ensuring that the activity is correctly assigned to the relevant operation.
Check BOM: Ensure that the components listed in the BOM are correctly linked to the activities in the routing. If the activity is supposed to use a specific component, it should be reflected in the BOM.
Update Master Data: If there have been recent changes to the routing or BOM, ensure that all relevant data is updated and consistent. You may need to reassign activities or components as necessary.
Review Production Order: If you are working with a production order, check the order details to ensure that the correct routing and BOM are being used. You may need to recreate the order if there are significant discrepancies.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the PP module and how to manage routings and BOMs effectively.
Contact Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
CA03
(Display Routing), CS03
(Display BOM), and CO02
(Change Production Order) to investigate and make necessary changes.By following these steps, you should be able to identify the root cause of the PPESNP029 error and implement the necessary corrections.
Get instant SAP help. Start your 7-day free trial now.
PPESNP028
The selected activity &1 does not have a mode
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPESNP027
The value of scrap &1 &2 can be a maximum of 100 percent
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPESNP030
&1 &2 does not have the type SNP plan
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPESNP031
The activity &1 already exists with a different internal key
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.