Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix PPESNP006 - Activity &1 was moved


PPESNP006 - Overview

  • Message type: E = Error

  • Message class: PPESNP - Message Class for SNP Routing

  • Message number: 006

  • Message text: Activity &1 was moved

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PPESNP006 - Details

  • The SAP error message PPESNP006, which states "Activity &1 was moved," typically occurs in the context of production planning and scheduling within the SAP system. This message indicates that a specific activity in a production order or project has been moved, which can affect the scheduling and planning of related activities.
    
    Cause: Rescheduling: The activity may have been rescheduled due to changes in resource availability, production priorities, or other planning adjustments. Manual Changes: A user may have manually adjusted the schedule or sequence of activities in the production order or project. System Adjustments: The system may have automatically adjusted the schedule based on changes in the overall production plan or constraints. Dependencies: Changes in predecessor or successor activities can lead to the movement of the activity in question.
    Solution: Review Activity Details: Check the details of the activity that was moved. Look for any changes in the scheduling or dependencies that may have caused the movement. Check Resource

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PPESNP006 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker