How To Fix PPESCMPV513 - Status object selected without specifying person responsible


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPESCMPV - Messages for Status Connection for CMP Variants

  • Message number: 513

  • Message text: Status object selected without specifying person responsible

  • Show details Hide details
  • What causes this issue?

    You wish to include a status object in a workflow that has not been
    assigned to a person responsible.
    In this case, no recipient can be determined for the workflow. This
    means that such status objects cannot be included in a workflow.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Assign a person responsible to the status object and repeat the
    operation.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPESCMPV513 - Status object selected without specifying person responsible ?

    The SAP error message PPESCMPV513 indicates that a status object has been selected without specifying a person responsible. This error typically occurs in the context of production planning or project management within SAP, where certain status objects require a responsible person to be assigned for tracking and accountability purposes.

    Cause:

    The primary cause of this error is that when you are trying to set or change the status of a particular object (like a production order, project, or task), the system requires you to specify a person responsible for that object. If this information is missing, the system will throw the error message PPESCMPV513.

    Solution:

    To resolve this error, you need to ensure that a person responsible is assigned to the status object you are working with. Here are the steps you can take:

    1. Identify the Status Object: Determine which status object you are trying to modify or set.

    2. Assign a Person Responsible:

      • Navigate to the relevant transaction or screen where you can manage the status object.
      • Look for a field labeled "Person Responsible" or similar.
      • Enter the user ID or select a person from the list of users who should be responsible for the status object.
    3. Save Changes: After assigning the person responsible, save your changes and try to execute the action again.

    4. Check Authorizations: Ensure that you have the necessary authorizations to assign a person responsible. If you do not have the required permissions, contact your SAP administrator.

    5. Consult Documentation: If you are unsure about the specific status object or the required fields, refer to the SAP documentation or help resources related to the module you are working in (e.g., Production Planning, Project System).

    Related Information:

    • Transaction Codes: Depending on the context, you may be using transaction codes like CO02 (Change Production Order), CJ20N (Project Builder), or others related to your specific SAP module.
    • User Roles: Ensure that the user you are assigning as responsible has the appropriate role and access rights in the system.
    • SAP Notes: Check for any relevant SAP Notes that might address this error or provide additional context or fixes.
    • Support: If the issue persists after following the above steps, consider reaching out to your SAP support team for further assistance.

    By following these steps, you should be able to resolve the PPESCMPV513 error and proceed with your tasks in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant