How To Fix PPESCMPV504 - Could not determine a person responsible


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPESCMPV - Messages for Status Connection for CMP Variants

  • Message number: 504

  • Message text: Could not determine a person responsible

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPESCMPV504 - Could not determine a person responsible ?

    The SAP error message PPESCMPV504: Could not determine a person responsible typically occurs in the context of SAP's Production Planning (PP) or Project System (PS) modules. This error indicates that the system is unable to identify a responsible person for a specific task, operation, or project element.

    Causes:

    1. Missing Master Data: The responsible person (e.g., a planner or project manager) may not be assigned in the relevant master data records (e.g., work centers, production orders, or project definitions).
    2. Configuration Issues: There may be configuration settings in the system that do not properly link the responsible person to the relevant objects.
    3. Authorization Issues: The user may not have the necessary authorizations to view or assign responsible persons.
    4. Incomplete Data Entry: During the creation of production orders or project tasks, the field for the responsible person may have been left blank or incorrectly filled.

    Solutions:

    1. Check Master Data:

      • Verify that the responsible person is correctly assigned in the relevant master data records. For example, check the work center or project definition to ensure that a person is designated as responsible.
      • Ensure that the personnel number or user ID is valid and exists in the system.
    2. Review Configuration:

      • Check the configuration settings in the SAP system to ensure that the responsible person can be determined based on the current settings. This may involve reviewing the settings in the IMG (Implementation Guide) related to Production Planning or Project System.
    3. User Authorizations:

      • Ensure that the user encountering the error has the necessary authorizations to view and assign responsible persons. This may involve checking roles and authorizations in the user profile.
    4. Data Entry Validation:

      • When creating or modifying production orders or project tasks, ensure that all required fields, including the responsible person, are filled out correctly.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on the error message and its context. This may provide additional insights into the issue.
    6. Contact Support:

      • If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with SAP support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CO01 (Create Production Order), CJ20N (Project Builder), or CR01 (Create Work Center) to navigate to the areas where the responsible person is defined.
    • SAP Notes: Check for any SAP Notes related to this error message, as they may provide specific fixes or patches that address the issue.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker