How To Fix PPERPP117 - Report. point with type &3 cannot be assigned at the beginning of &1 &2


PPERPP117 - Overview

  • Message type: E = Error

  • Message class: PPERPP - Messages for iPPE Application Object RPP

  • Message number: 117

  • Message text: Report. point with type &3 cannot be assigned at the beginning of &1 &2

  • Show details Hide details
  • What causes this issue?

    A reporting point with the type
    <LS>Post Goods Movement and Production Activities</> is assigned to the
    beginning of a line object.

    System Response

    For reporting points with this type, the matrix components that are
    assigned to the resource are already withdraw
    at the backflush for this reporting point and not at the end
    of the line of line activity.
    Therefore, the components can be withdrawn too early causing incorrect
    WIP to be reported

    How to fix this error?

    Delete the assignment of the reporting point to the beginning of the
    line object.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPERPP117 - Report. point with type &3 cannot be assigned at the beginning of &1 &2 ?
    The SAP error message PPERPP117 typically occurs in the context of production planning or project management when there is an issue with the assignment of a report point in a process or project. The message indicates that a report point of a specific type cannot be assigned at the beginning of a certain object (like a project or production order).
    
    Cause: The error can be caused by several factors, including: Incorrect Configuration: The report point type being assigned may not be valid for the specified object type or may not be configured correctly in the system. Business Rules: There may be business rules or constraints that prevent the assignment of certain report points at the beginning of a project or order. Data Integrity Issues: There may be inconsistencies or missing data in the master data or transaction data that are causing the assignment to fail. Authorization Issues: The user may not have the necessary authorizations to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant