How To Fix PPEPRO043 - Network activity &1 has been technically completed


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEPRO - iPPE PS Interface and PS External Objects

  • Message number: 043

  • Message text: Network activity &1 has been technically completed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEPRO043 - Network activity &1 has been technically completed ?

    The SAP error message PPEPRO043 indicates that a network activity has been technically completed. This typically occurs in the context of project management or production planning within SAP, particularly when dealing with networks in the Project System (PS) or Production Planning (PP) modules.

    Cause:

    The error message is triggered when you attempt to perform an action on a network activity that has already been marked as technically completed. This means that the activity has been finalized, and no further changes or actions can be performed on it. Common scenarios that lead to this error include:

    • Attempting to change the status of a completed activity.
    • Trying to assign resources or costs to an activity that is already completed.
    • Attempting to delete or modify a network activity that has been closed.

    Solution:

    To resolve this error, consider the following steps:

    1. Check Activity Status: Verify the status of the network activity. If it is indeed completed, you will need to assess whether any further actions are necessary or if you need to create a new activity for any additional work.

    2. Reopen Activity: If you need to make changes to the completed activity, you may need to reopen it. This typically requires changing the status back to a working status, which may involve specific authorizations or settings in your SAP system.

    3. Create New Activity: If reopening the activity is not feasible or allowed, consider creating a new network activity to handle any additional tasks or changes required.

    4. Consult Documentation: Review the project documentation or consult with your project manager to understand the implications of reopening a completed activity or creating a new one.

    5. Authorization Check: Ensure that you have the necessary authorizations to make changes to network activities. If you lack the required permissions, contact your SAP administrator.

    6. SAP Notes and Support: If the issue persists or if you believe it is a system error, check for any relevant SAP Notes or patches that may address this issue. You can also reach out to SAP support for further assistance.

    Related Information:

    • Project System (PS): This module is used for managing projects, including planning, execution, and monitoring.
    • Production Planning (PP): This module focuses on the planning and control of manufacturing processes.
    • Network Activities: In SAP, network activities are used to represent tasks or operations within a project or production process.

    Understanding the context of the error and the specific business processes involved will help in determining the best course of action.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.