Message type: E = Error
Message class: PPEMPL -
Message number: 100
Message text: MPL node &1 is not permitted as color reference
You are attempting to define a color reference of a PVS variant to an
MPL color node. However, MPL color nodes are not intended, and therefore
such a connection is not allowed, so that behavior in the recursion test
is consistent.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPEMPL100
- MPL node &1 is not permitted as color reference ?The SAP error message PPEMPL100 indicates that a specific node in the Multi-Plant (MPL) structure is not permitted to be used as a color reference. This error typically arises in the context of SAP's Product Lifecycle Management (PLM) or when dealing with material master data, particularly in the area of variant configuration or color management.
Cause: Node Configuration: The node specified in the error message (denoted as &1) may not be configured correctly in the system. It might not be set up to allow color references. Authorization Issues: The user may not have the necessary authorizations to access or modify the specified node. Data Inconsistencies: There may be inconsistencies in the data related to the MPL structure, such as missing or incorrect entries in the configuration. Incorrect Material Type: The material type associated with the node may not support color references.
Solution: Check Node Configuration: Go to the MPL configuration settings and verify that the node is
Get instant SAP help. Sign up for our Free Essentials Plan.
PPEMPL082
Conversion of table &1 ongoing; &2 data records converted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEMPL081
Conversion was successful
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEMPL101
Recursion between PVS and MPL is possible
What causes this issue? The system has checked whether recursions exist within the PVS and MPL structures. However, it is still possible that structu...
PPEMPL102
Connection between MPL and PVS objects is not permitted
What causes this issue? The system has determined one of the following problems: No subrelationship can exist between the CMP nodes of a Master Parts...
Click on this link to search all SAP messages.