Message text: Relationship between &1 &2 and &3 &4 recreated during explosion
Individual line nodes of a line networf were not assigned to the
exploded line structure. This is the case if individual lines nodes of
line network have not been assigned to a partial line network but they
have been assigned to its predecessor and successor.
The explosion generates new relationships to link the predecessor and
successor to each other.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPEFLO420
- Relationship between &1 &2 and &3 &4 recreated during explosion ?The SAP error message PPEFLO420 indicates that there is a problem with the relationship between components in a bill of materials (BOM) during the explosion process in production planning or similar scenarios. This error typically arises when the system attempts to explode a BOM and encounters inconsistencies or issues with the relationships defined between the various components.
Cause:
- Inconsistent BOM Data: The relationships between the parent and child components in the BOM may not be correctly defined or may have been altered.
- Missing Components: One or more components required for the explosion may be missing or not properly maintained in the system.
- Incorrect Configuration: The configuration settings for the BOM or the production order may not be set up correctly, leading to issues during the explosion.
- Versioning Issues: If there are multiple versions of the BOM, the system may be trying to use an outdated or incorrect version.
- Data Integrity Issues: There may be data integrity issues in the database that affect how relationships are recognized during the explosion.
Solution:
- Check BOM Configuration: Review the BOM configuration to ensure that all components and their relationships are correctly defined. Make sure that the parent-child relationships are valid.
- Validate Components: Ensure that all components listed in the BOM are available and correctly maintained in the system. Check for any missing or inactive materials.
- Review Versioning: If multiple versions of the BOM exist, ensure that the correct version is being used for the explosion process.
- Data Consistency Check: Run data consistency checks in SAP to identify and resolve any integrity issues in the BOM or related master data.
- Recreate Relationships: If necessary, recreate the relationships between the components in the BOM to ensure they are correctly defined.
- Consult Documentation: Refer to SAP documentation or notes related to BOM management and the specific error message for additional guidance.
Related Information:
By following these steps, you should be able to identify and resolve the issue causing the PPEFLO420 error message in SAP.
Get instant SAP help. Start your 7-day free trial now.
PPEFLO419
No valid line balance relationship exists for line structure &1
What causes this issue? When exploding a process structure and a line structure, the system determined that no line balance relationships have been m...
PPEFLO418
&1 &2 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEFLO421
You must assign a storage location at supply area &1 (&2)
What causes this issue? No storage location is assigned to supply area &V1& in location &V2&. This represents an inconsistency of the...
PPEFLO600
*** Interface Messages ***
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.